Project Description
CL&P is replacing seven fluid-filled transmission cables between Norwalk, Connecticut, and Northport, New York, with three new solid-core (non-fluid filled) cables. The replacement cables will significantly improve reliability of service to both states and reduce environmental impacts resulting from damage of the existing cables. Read the Long Island Replacement Cable project overview.
| Length: | 11 miles |
| Operating voltage: | 138,000 volts |
| Cable specifications: | Solid dielectric (i.e., plastic insulation), copper conductor. The replacement will consist of three cables. |
| Installation: | Buried approximately six feet into the seabed. |
| Cost: | NU's share of the project cost is an estimated $72 million. |
| Regulatory review by: | Connecticut: The Connecticut Siting Council, Connecticut Department of Public Utility Control, Connecticut Department of Environmental Protection
New York: New York Public Service Commission and Department of Environmental Conservation
Federal: U.S. Army Corps of Engineers
|
| Timetable: |
Construction scheduled to begin, fall 2007
Projected in-service date, fall 2008
|

|
 |