New England East-West Solution (NEEWS)
Middletown-Norwalk
LI Replacement Cable
Project Description
Construction Updates
Frequently Asked Questions
Marine Environmental Monitoring Surveys
Additional Links
Contact LIRC
Glenbrook Cables
Waterford Substation
Sherwood Substation
Agawam-West Springfield
Bethel-Norwalk
|
 |
 |
 |
Project Description
CL&P replaced seven fluid-filled transmission cables between Norwalk, Connecticut, and Northport, New York, with three new solid-core (non-fluid filled) cables. The replacement cables will significantly improve reliability of service to both states and reduce environmental impacts resulting from damage of the existing cables. Read the Long Island Replacement Cable project overview.
| Length: | 11 miles |
| Operating voltage: | 138,000 volts |
| Cable specifications: | Solid dielectric (i.e., plastic insulation), copper conductor. The replacement will consist of three cables. |
| Installation: | Buried approximately six feet into the seabed. |
| Cost: | NU's share of the project cost is $79 million. |
| Regulatory review by: | Connecticut: The Connecticut Siting Council, Connecticut Department of Public Utility Control, Connecticut Department of Environmental Protection
New York: New York Public Service Commission and Department of Environmental Conservation
Federal: U.S. Army Corps of Engineers
|
| Timetable: |
Construction began: Fall 2007
In-service date: July 29, 2008
|

|
 |