 |
New England East-West Solution (NEEWS)
Middletown-Norwalk
LI Replacement Cable
Project Description
Construction Updates
Frequently Asked Questions
Marine Environmental Monitoring Surveys
Additional Links
Contact LIRC
Glenbrook Cables
Waterford Substation
Sherwood Substation
Agawam-West Springfield
Bethel-Norwalk
|
 |
 |
 |
Marine Environmental Monitoring Surveys
Please note: Volumes that contain photographs are quite large and may take a considerable amount of time to download if you are using a 28K or 56K modem.
- Part I - Pre-Construction Survey Report
(104,933KB)
- Part II - Construction and Early Post-Construction Survey Reports
(30KB)
- Part III - Post-Construction Seafloor Mapping Survey -- A component of the Benthic Monitoring Study for the Long Island Replacement Cable Project, Summer 2008
(64KB)
- Part III - Post-Construction Seafloor Mapping Survey -- A component of the Benthic Monitoring Study for the Long Island Replacement Cable Project, Winter 2009
(337KB)
- Initial, Three-Month, and Six-Month Benthic Biology Surveys -- A Component of the Benthic Monitoring Study for the Long Island Replacement Cable Project, Summer 2008, Fall 2008, and Winter 2009 -- Sheffield Harbor and Long Island Sound, Norwalk, Connecticut
(11.6MB)
- Analysis of the Sediment Transport Regime in Sheffield Harbor Before, During and After Construction of the Long Island Replacement Cable Project
(25MB)
- Sediment Temperature Study of the Long Island Replacement Cables
(1.4MB)
- Part III - Post-Construction Seafloor Mapping Survey -- A component of the Benthic Monitoring Study for the Long Island Replacement Cable Project, Summer 2009
(67MB)
- Magnetic Intensity Study, November 2009 -- Long Island Replacement Cables, Sheffield Harbor and Long Island Sound, Norwalk, Connecticut
(4,004KB)
- Twelve-Month Benthic Biology Survey
A Component of the Benthic Monitoring Study for the Long Island Replacement Cable Project - Summer 2009 - Sheffield Harbor & Long Island Sound (4,284KB)
|
 |