Middletown-Norwalk
Project Description
Interactive Map
At-A-Glance
Frequently Asked Questions
Detailed Design (D&M) Plans
Resources and Links
Archived Documents
News and Updates
Contact Information
LI Replacement Cable
Glenbrook Cables
Waterford Substation
Bethel-Norwalk
Northeast Connecticut Reliability Project
New England East-West Solution (NEEWS)
Greater Springfield Reliability Project (GSRP)
Interstate Reliability Project (IRP)
Central Connecticut Reliability Project (CCRP)
|
 |
 |
 |
Fairfield
The total route in Fairfield consists of 3.6 miles of new 345-kV underground lines.
See the Route
What's Being Built
Construction Update
The Route Through Fairfield
(255KB)
What's Being Built in Fairfield
Underground Lines
In Fairfield, two new 345-kV transmission lines will be installed underground in a single duct bank. Traveling northeast to southwest, the 3.6 mile route follows:
- Post Road Street (CT Route 130) - from Fairfield/Bridgeport town line to Post Road (US Route 1)
- Post Road East (US Route 1) - from Post Road (CT Route130) to Old Post Road
- Old Post Road - from Post Road East (US Route1) to Pequot Avenue
- Pequot Avenue - from Old Post Road to Boston Post Road (US Route 1)
- Boston Post Road (US Route 1) - from Pequot Avenue to Westport town line
Fairfield Construction Update
|
This Week: | May 12-17 | Duct bank trenching will occur on Old Post Road between Pequot Avenue and John Street, generally between 7 a.m. and 7 p.m. Trenching will also occur on Post Road between Center Street and the Westport Town line, between 6 p.m. and 6 a.m. Crews will also be working on Post Road in the vicinity of Sasco Hill Road, approximately between 6 p.m. and 6 a.m. Trenching will also occur on Post Road between the Ash Creek/Bridgeport City line and Shoreham Terrace between 7 p.m. and 6 a.m. | | Today: | May 17 | |
Bookmark this page and check back regularly for new information and important updates.

|
 |