Contact Us NU Transmission Media Information

   Project Information for Customers
Customers Home Leadership Benefits Project Locations & Information Stay Informed Your Safety & Health Environmental Stewardship Questions & Answers  
NU Transmission >> Project Information for Customers Home >> Projects >> Middletown-Norwalk >> West Haven

Middletown-Norwalk
Project Description
Interactive Map
At-A-Glance
Frequently Asked Questions
Detailed Design (D&M) Plans
Resources and Links
Archived Documents
News and Updates
Contact Information

LI Replacement Cable

Glenbrook Cables

Waterford Substation

Bethel-Norwalk

Northeast Connecticut Reliability Project

New England East-West Solution (NEEWS)

Greater Springfield Reliability Project (GSRP)

Interstate Reliability Project (IRP)

Central Connecticut Reliability Project (CCRP)

Project logoWest Haven

The total overhead right of way (ROW) in West Haven consists of 0.1 miles of new and reconstructed overhead lines.

See the Route
What's Being Built
Construction Update

The Route Through West Haven

The Route Through Orange and West Haven PDF (285KB)

What's Being Built in West Haven

Note that the descriptions below are typical designs for your area and do not represent the specific structure design and height being constructed on the right of way on your property. For property-specific information, call our Project Hotline at 1-866-MID-NORW (643-6679). Detailed design plans can also be obtained from your town hall or from the Connecticut Siting Council.

Overhead Lines
The right of way (ROW) in West Haven is 165 feet wide and covers a distance of only 0.1 mile. One set of structures (four poles total) will be located in West Haven on South Central Connecticut Regional Water Authority property. The two wood H-Frames and one steel lattice structure will be removed and replaced with two sets of steel monopoles - 115-kV double circuit monopoles at 105 feet and 345-kV split phase monopoles at 135 feet.

West Haven Construction Update

This Week:February 25-March 8Foundation drilling and installation will the place within the right of way.
Today:May 11
Latest Traffic Report
Bookmark this page and check back regularly for new information and important updates.

get Abode Acrobat Reader

Print page without header or side navigationPrinter Friendly Page

Project Information for Customers Home | Energy Needs | Benefits | Projects
Your Voice Matters | Stay Informed | Environmental Stewardship | Q&A's
NU Transmission Home | Media Information | Contact Us | Privacy Statement

For questions, comments and requests for information about NU Transmission: Contact Us